Public announcement of environmental impact assessment of the regeneration and recycling waste activated carbon project of Hangzhou Xingyu Carbon Environmental Technology Co., Ltd. [2021] No. 5
Time:2022-02-17

According to the "Environmental Protection Law of the People's Republic of China", "Environmental Impact Assessment Law of the People's Republic of China" and other requirements, the construction unit entrusted Zhejiang Environmental Engineering Co., Ltd. to undertake the regeneration of "Jianzheng Gongchu [2021] No. 5 Hangzhou Xingyu Carbon Environmental Protection Technology Co., Ltd. Environmental impact assessment of the “Recycling Waste Activated Carbon Project”. In accordance with the relevant requirements of the "Administrative Measures for Environmental Protection of Construction Projects in Zhejiang Province" and the "Decision of the People's Government of Zhejiang Province on Amending the "Measures for Price Monitoring and Early Warning in Zhejiang Province" and other relevant requirements (Order No. 388 of the People's Government of Zhejiang Province) Jianzheng Gongchu [2021] No. 5 Hangzhou Xingyu Carbon Environmental Technology Co., Ltd.'s environmental impact assessment of waste activated carbon recycling and utilization of waste activated carbon project for public participation in information disclosure, so that the public in the areas that may be affected by the project construction may have an understanding of the project construction situation, and through Information disclosure is to understand the public's attitudes and suggestions on this project, and accept the supervision of the public. The relevant content is now publicized as follows:
1. Name and summary of the construction project
Project name: Jianzheng Gongchu [2021] No. 5 Hangzhou Xingyu Carbon Environmental Protection Technology Co., Ltd. Recycling Waste Activated Carbon Project
Construction Unit: Hangzhou Xingyu Carbon Environmental Protection Technology Co., Ltd.
Project nature: New construction
Project investment: 146 million yuan
Construction scale and content: After the implementation of the project, the annual regeneration capacity of 10,000 tons/year hazardous waste activated carbon and 20,000 tons/year general waste activated carbon will be formed, and the production capacity will be 30,000 tons/year. Annual regeneration of activated carbon products.
Construction address: High-speed Railway New District, Jiande City, Hangzhou
2. Distribution of sensitive targets in main links around
the project The main sensitive targets within the evaluation scope of the project are shown in Table 1 below.

Table 1 Main sensitive targets within the evaluation scope of this project

category

name

object of protection 

Protect 
content

scale

Environmental protection goals

Relative site orientation

Relative factory boundary distance/m

environmental risk ambient air

Yanling Community

Residential area

crowd

2028 households, 4517 people

Within 100m from the riverside, it is a first-class area, and the rest are second-class areas.

NE

4331

Plum Community

Residential area

crowd

3199 households, 5900 people

Class II area

NE

4296

West Lake Village

Residential area

crowd

1128 people

Class II area

NE

4079

Gujiacun

Residential area

crowd

2000 people

Class II area

NE

3430

Wangshan Village

Residential area

crowd

615 households, 2186 people

Class II area

NE

4109

Chizuru Village

Residential area

crowd

1267 people

Within 100m from the riverside, it is a first-class area, and the rest are second-class areas.

NE

1441

East Lake Community

Residential area

crowd

148 households, 324 people

Within 100m from the riverside, it is a first-class area, and the rest are second-class areas.

NE

4538

Baohuazhou Community

Residential area

crowd

2506 households, 4995 people

Within 100m from the riverside, it is a first-class area, and the rest are second-class areas.

NE

3748

General government community

Residential area

crowd

3200 households, 7244 people

Class II area

NE

4896

Gejia Village

Residential area

crowd

375 households, 1194 people

Within 100m from the riverside, it is a first-class area, and the rest are second-class areas.

E

2993

Jiangshan Village

Residential area

crowd

924 households, 3178 people

Class II area

S

1230

Nanfeng Village

Residential area

crowd

2100 people

Within 100m from the riverside, it is a first-class area, and the rest are second-class areas.

E

3879

Longxi Village

Residential area

crowd

551 households, 1916 people

Class II area

NW

3989

Shilibu Village

Residential area

crowd

236 households, 740 people

Within 100m from the riverside, it is a first-class area, and the rest are second-class areas.

NE

2479

Guanlu Village

Residential area

crowd

1000 people

Class II area

NE

4488

Yangcunqiao Village

Residential area

crowd

951 households, 2868 people

Class II area

NW

3887

Ziyuan Village

Residential area

crowd

609 households, 2039 people

Class II area

NE

4983

Fenghe Village

Residential area

crowd

2709 people

Within 100m from the riverside, it is a first-class area, and the rest are second-class areas.

W

2316

Jiande Meicheng Junior High School

School

crowd

/

Class II area

NE

2638

Zhejiang Yanzhou Middle School (Meicheng Campus)

School

crowd

/

Class II area

NE

4412

Yangcunqiao Middle School Kindergarten

School

crowd

/

Class II area

NW

4281

Meicheng Kindergarten (West Lake Branch)

School

crowd

/

Class II area

NE

4277

Qianhe Oasis Elementary School

School

crowd

/

Class II area

NE

3686

Jiande Hangzhou Guangyu Hope Primary School

School

crowd

/

Class II area

NW

4155

Yangcunqiao Town Junior High School

School

crowd

/

Class II area

NW

4532

Jiande City Yanzhou Kindergarten

School

crowd

/

Class II area

NE

4200

Jiande Meicheng Kindergarten

School

crowd

/

Class II area

NE

4501

Yanshi Primary School

School

crowd

/

Class II area

NE

4507

Ge family kindergarten

School

crowd

/

Class II area

SE

3468

Meicheng Nanfeng Primary School, Jiande City

School

crowd

/

Class II area

SE

3571

Jiande Second People's Hospital

Hospital

crowd

/

Class II area

NE

4954

Jiande City Yangcunqiao Traditional Chinese Medicine Orthopaedic Hospital

Hospital

crowd

/

Class II area

NW

3977

Meicheng Township Health Center

Hospital

crowd

/

Class II area

NE

4475

ambient air

Longquan Village

Residential area

crowd

923 households, 2512 people

Class II area

NE

5091

Shangshan Village

Residential area

crowd

1729 people

Class II area

NE

5865

Xutang Village

Residential area

crowd

776 households, 2571 people

Class II area

NW

5038

Shijiacun

Residential area

crowd

442 households, 1395 people

Within 100m from the riverside, it is a first-class area, and the rest are second-class areas.

SW

5141

Ukoma City Village

Residential area

crowd

2220 people

Class II area

NW

6342

Meicheng Central Primary School

School

crowd

/

Class II area

NE

5074

groundwater

Groundwater Environmental Quality

/

/

/

/

Class III

/

surface water

Qiantang 160

4km upstream of the water intake of the original Meicheng Waterworks—0.5km downstream of the water intake of Yuanmeicheng Waterworks

Class II

NW

about 600m

Qiantang 161

0.2km downstream of the water intake of the former Meicheng Water Plant—Meicheng Sanjiangkou

Class III

NW

About 2.4km

acoustic environment

Acoustic environment within 200m outside the factory boundary

Sensitive points of silent environment within 200m

/

/

/

soil environment

Soil environment 1km outside the factory boundary

1km of cultivated land and residential area outside the factory boundary

/

/

/

ecosystem

Two Rivers and One Lake Xin'anjiang Scenic Spot

/

Ecologically sensitive area

N

600

 3. Overview of the possible impact of the project on the environment
(1) Water environment
In the initial stage of the project, the rainwater, tail gas treatment wastewater and workshop ground flushing water are pretreated together to reach the maximum allowable emission concentration limit of the first type of pollutants before entering the sewage station in the factory area. After the sewage station treatment reaches the acceptance standard, it is connected to the municipal pipe network. Later, the rainwater is collected by the rainwater pipe network of the plant and then connected to the municipal sewage pipe network; the waste heat boiler soft water concentrate and boiler sewage, cooling circulating water, laboratory wastewater, and domestic sewage The sewage treatment station in the factory area is connected to the municipal sewage pipe network after the treatment reaches the standard, and the water quality of the treated water shall comply with the third-level standard of the "Integrated Wastewater Discharge Standard" (GB8978-1996). The 35mg/L and 8mg/L stipulated in the Indirect Pollutant Discharge Limits (DB33/87-2013), and finally reached the "Pollutant Discharge Standards for Urban Sewage Treatment Plants" (GB18918-2002) by Jiande Sanjiang Ecological Management Co., Ltd. ) and then discharged to the "Qiantang 161" section of Xin'an River (the "Qiantang 161" section implements the "Surface Water Environmental Quality Standard" (GB3838-2002) Class III water quality standard). In conclusion, the project has little impact on the water environment; the groundwater quality of the project site is relatively good, meeting the requirements of Class III groundwater quality. As long as the construction unit actively implements the corresponding prevention measures and strengthens management, the project has limited impact on the groundwater in the site, and the impact on the area is not obvious.
(2) Atmospheric environment
According to the analysis of the forecast results, under normal working conditions, the short-term concentration and long-term concentration of each pollution factor emitted by the project can meet the corresponding environmental quality standards; other projects under construction and environmental background After that, the short-term concentration and long-term concentration of each pollution factor discharged by the project can meet the standard rate of daily average concentration and annual average mass concentration of the guaranteed rate or the short-term concentration quality requirements. According to the analysis, there is no need to set the atmospheric environment protection distance after the project is implemented.
(3) Noise
There are no sensitive points within the scope of noise assessment of this project, and the noise source of the project can meet the requirements of Category 3 of the "Environmental Noise Emission Standard for Industrial Enterprises" (GB12348-2008) after taking sound insulation and noise reduction measures. The influence of the surrounding environment is not obvious, and it will not change the function of the regional acoustic environment.
(4) Solid waste
Based on the strict implementation of various solid waste disposal measures proposed in this EIA, the solid waste of this project can be temporarily stored and properly disposed of in a standardized manner, basically achieving zero discharge and no obvious impact on the surrounding environment.
(5) Soil environmental impact
The plant where the project is located and the road surface have been hardened with cement. Blocked by the plant and fence, the ground overflow generated by the leakage can be controlled within the plant and will not affect the soil basically. After the enterprise implements the groundwater zoning anti-seepage measures, there will be no vertical infiltration impact. The enterprise is not involved in the emission of persistent organic compounds, and the exhaust gas emission is small, which is absorbed by the surrounding greenery through atmospheric diffusion, and has little impact on the soil environment. The EIA believes that the soil environmental impact caused by the project is acceptable.
(6) Accident risk
According to the accident risk impact analysis, the types of accidents that may occur in this project include fire and leakage accidents. After the implementation of various risk prevention measures, the probability of environmental risk accidents that may occur in the project is small, and the impact of accident consequences is small; after the completion of the proposed project, the construction unit should entrust relevant professional technical service agencies to prepare an environmental emergency plan, and report it to the local environmental protection Competent departments for the record, and regular training and emergency drills. In general, the risk level of this project is acceptable.
4. Countermeasures and measures to prevent and mitigate adverse environmental impacts
 

Table 2 Summary of pollution prevention and control measures

content

type

pollutants

Prevention

Expected governance effect

water pollutants

Production wastewater, initial rainwater, domestic sewage

The initial rainwater is pretreated together with the exhaust gas treatment wastewater and the workshop ground flushing water to reach the maximum allowable emission concentration limit of the first type of pollutants and then enters the sewage station in the plant area. After the sewage station treatment reaches the management standard, it is connected to the municipal pipe network. The rainwater pipe network in the plant area is collected and connected to the municipal sewage pipe network; the waste heat boiler soft water concentrate, boiler sewage, cooling circulating water, laboratory wastewater, and domestic sewage are connected to the municipal sewage pipe network after being treated by the sewage treatment station in the plant area.

Comply with the third-level standard of "Comprehensive Wastewater Discharge Standard" (GB8978-1996), of which ammonia nitrogen and total phosphorus meet the 35mg specified in Zhejiang Province's local standard "Indirect Emission Limit of Nitrogen and Phosphorus Pollutants in Wastewater from Industrial Enterprises" (DB33/87-2013) /L and 8mg/L up to standard discharge

air 
pollutants

Waste activated carbon regeneration waste gas

Exhaust gas→SNCR→quenching chamber→alkali washing→water washing→35m exhaust pipe 1# discharge

It meets the relevant requirements in the "Emission Standards for Air Pollutants in Industrial Furnaces" (GB 9078-1996) and the "Implementation Plan for Comprehensive Control of Air Pollution in Industrial Furnaces in Zhejiang Province" (Zhehuanhan [2019] No. 315), among which "Industrial Furnaces and Kilns" The emission limits of pollution factors (HCl, HF, dioxins, etc.) not specified in the Air Pollutant Emission Standard (GB9078-1996) meet the standards in the Pollution Control Standard for Hazardous Waste Incineration (GB 18484-2020) The limit, the fugitive ammonia emission limit is in line with the implementation of the "Notice on Issuing the Technical Policy for the Prevention and Control of Nitrogen Oxides in Thermal Power Plants" (Huanfa [2010] No. 10)

drying exhaust gas

Relying on waste activated carbon regeneration waste gas treatment system to treat emissions

/

Screening dust, mixing dust, packaging dust

Exhaust gas→bag filter→22m exhaust pipe 2# discharge

Meet the "Comprehensive Emission Standard of Air Pollutants" (GB16297-1996)

natural gas combustion exhaust

35m exhaust pipe 1# discharge

Particulate matter and sulfur dioxide can meet the new gas boiler limits in Table 1 of the "Boiler Air Pollutant Emission Standard" (DB3301/T0250-2018), and nitrogen oxides can meet the "14th Five-Year Plan for Air Quality Improvement in Zhejiang Province" Notice" (Zhe Fa Gai Planning [2021] No. 215) Column 2 Limits of Newly-built Gas-fired Boilers in Industrial Boiler Comprehensive Treatment Projects

Hazardous waste temporary storage waste gas

Exhaust gas → two-stage activated carbon adsorption → 22m exhaust pipe 4# discharge

The odor emission meets the limits of the "Emission Standard for Odor Pollutants" (GB14554-93), and the emission of non-methane total hydrocarbons, benzene, toluene and xylene meets the secondary standards in the "Comprehensive Emission Standard for Air Pollutants" (GB16297-1996).

Sewage station stench

Exhaust gas → activated carbon adsorption → 22m exhaust pipe 5#

Meet the "odor pollutant discharge standard" (GB14554-93) limit

laboratory exhaust

Experimental operations that may generate volatile gases, such as dumping, mixing, and configuration, are required to be performed on a fume hood. The amount of laboratory exhaust gas generated is small and the concentration is low. It is collected through an extraction hood and sent to the roof for discharge.

/

canteen fumes

After being collected and purified by the fume purifier, the special flue exhaust pipe 6# is discharged at high altitude

Meet the "Food Fume Emission Standard for Catering Industry" (GB18483-2001) standard

sound polution

Mechanical equipment noise

(1) According to the noise source characteristics of the proposed project, in the design and equipment procurement stage, fully select advanced low-noise equipment to reduce the noise of the equipment itself from the sound source. 
(2) Reasonable layout, high-noise equipment should be arranged in the middle of the workshop as much as possible to reduce the impact on the noise at the factory boundary. Arrange the fan position reasonably, and arrange the outdoor fan away from the factory boundary if the design conditions allow. The outdoor fan shall be provided with a vibration damping foundation and a sound insulation cover shall be installed, and appropriate noise reduction measures shall be taken for the inlet and outlet pipes of the fan equipment. 
(3) Vibration reduction and vibration isolation measures shall be adopted during the installation of high-noise equipment, and independent computer rooms shall be set up for air compressors. 
(4) Strengthen the maintenance of the equipment to ensure that the equipment is in a good operating state, and eliminate the phenomenon of high noise caused by the abnormal operation of the equipment. 
(5) Do a good job in the greening of the entire factory area, and strive to create a green barrier to beautify the environment and reduce sound pollution.

Reached Category 3 regional standards in "Environmental Noise Emission Standard for Industrial Enterprises" (GB12348-2008)

Solid Waste

fly ash

Entrust a qualified unit to dispose of

Proper disposal, zero emissions

Waste activated carbon from waste gas treatment facilities

self-disposal

sludge

Entrust a qualified unit to dispose of

waste oil

Entrust a qualified unit to dispose of

waste bag

Entrust a qualified unit to dispose of

laboratory waste

Entrust a qualified unit to dispose of

waste packaging

Entrust a qualified unit to dispose of

waste heat transfer oil

Entrust a qualified unit to dispose of

domestic waste

Sanitation department unified clearing and transportation

 

5. Basic conclusion of environmental impact assessment
According to the assessment conclusion, the project conforms to the industrial policies of the state, province and city. At the same time, the project meets the requirements of local environmental function zoning; the pollutants can be discharged up to the standard after the implementation of various environmental protection measures proposed in this report; the discharged pollutants meet the national and provincial regulations for total emission control indicators of major pollutants; the project meets the "third-line" “One Order” requirement; the environmental accident risk level of the project is acceptable.
Enterprises must conscientiously implement the pollution prevention and control measures proposed in this EIA report, implement risk prevention measures, and strictly implement the acceptance system for completed environmental protection facilities to minimize the impact of construction projects on the surrounding environment. From the perspective of environmental protection, the construction of this project is feasible.
6. Scope and main matters of soliciting public opinions
(1) Scope: mainly for residents, enterprises and institutions around the project construction site;
(2) Main matters: ① Opinions or opinions on the current environmental quality of the region, ② Environmental protection behavior of enterprises ③ opinions, opinions or requirements on construction projects, ④ requirements or opinions on environmental protection work of the local government and relevant departments.
7. Method and time
of publicity This publicity will be publicized in the form of on-site posting on the publicity boards of communities, streets and other units and on the website.
Announcement time: February 17, 2022 - March 3, 2022.
8. The specific form of public comments The
public (individuals or groups) shall communicate with the construction unit, the EIA unit, the construction unit, the EIA unit, the construction unit by letter, telephone or other means within 11 working days from the date of this announcement (until March 3, 2022). Contact the environmental protection department. It is recommended that the group unit be stamped with the official seal, and the individual should name and explain the contact information. The environmental impact assessment unit will truthfully record the public's opinions and suggestions in the "Environmental Impact Report", and reflect the public's valuable opinions and suggestions to the construction unit, design unit and relevant departments of the project.
(1) Name and contact information
of construction unit Construction unit: Hangzhou Xingyu Carbon Environmental Protection Technology Co., Ltd.
Address: High-speed Railway New District, Jiande City, Hangzhou City
Contact person: Manager Hong
Contact number: 18667107885
(2) Name and contact information of environmental impact assessment agency
EIA unit: Zhejiang Environmental Engineering Co., Ltd.
Unit address: 6-7 floors, No. 9 Huanggushan Road, Hangzhou City, Zhejiang Province
Contact: XCMG
Contact Tel : 0571-87242326 (
3) Name and contact information of the approval department Name of the unit :
Jiande Branch of Hangzhou Ecological Environment Bureau ]: The public is requested to provide detailed contact information as much as possible while expressing their opinions.



 

Issued by: Hangzhou Xingyu Carbon Environmental Protection Technology Co., Ltd. (seal)
Release time: February 17, 2022

Hangzhou Xingyu Carbon S&T Co., Ltd.

Address: No. 10, Wumazhou Road, Meicheng Town, Jiande City, Hangzhou City, Zhejiang Province, China
Postcode: 311722